<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>FeedstockData — Biomethane</title><link>https://feedstockdata.com/category/biomethane/</link><description>Biomethane</description><language>en-gb</language><atom:link href="https://feedstockdata.com/category/biomethane/rss.xml" rel="self" type="application/rss+xml"/><lastBuildDate>Fri, 06 Nov 2026 08:00:00 +0000</lastBuildDate><item><title>MOL launched its first biomethane plant in Hungary: Szarvas and meat industry waste</title><link>https://feedstockdata.com/knowledge/mol-launches-first-biomethane-plant-in-hungary-szarvas-meat-industry-waste/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/mol-launches-first-biomethane-plant-in-hungary-szarvas-meat-industry-waste/</guid><pubDate>Wed, 21 Oct 2026 08:00:00 +0000</pubDate><category>Biomethane</category><description>The MOL Group started up its first biomethane plant in Szarvas, Hungary: an expansion of a biogas plant with an upgrading module will replace more than 7 million m³ of natural gas per year. The feedstock is meat industry waste and animal manures.</description><enclosure url="https://feedstockdata.com/og/wpis-mol-launches-first-biomethane-plant-in-hungary-szarvas-meat-indus.jpg" type="image/jpeg" length="0"/></item><item><title>An agricultural biomethane plant injecting biomethane into the grid has started up in Komorów</title><link>https://feedstockdata.com/knowledge/komorow-agricultural-biomethane-plant-starts-injecting-gas-into-grid/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/komorow-agricultural-biomethane-plant-starts-injecting-gas-into-grid/</guid><pubDate>Mon, 28 Sep 2026 08:00:00 +0000</pubDate><category>Biomethane</category><description>On 25 September 2026 the Agro-Biogas agricultural biomethane plant was started in Komorów (Ostrów Mazowiecka municipality): about 20 GWh of biomethane per year from manure and slurry, injected into the PSG grid; sales are handled by Axpo under a 20-year agreement.</description><enclosure url="https://feedstockdata.com/og/wpis-komorow-agricultural-biomethane-plant-starts-injecting-gas-into-g.jpg" type="image/jpeg" length="0"/></item><item><title>Czech biomethane auction oversubscribed fourfold: bids for 176.4 million m³ against a volume of 45 million m³</title><link>https://feedstockdata.com/knowledge/czech-biomethane-auction-oversubscribed-fourfold-176-4-million-m3-offered/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/czech-biomethane-auction-oversubscribed-fourfold-176-4-million-m3-offered/</guid><pubDate>Fri, 11 Sep 2026 08:00:00 +0000</pubDate><category>Biomethane</category><description>The first Czech operating support auction for biomethane (45 million m³ per year, held in May) drew huge interest: 63 projects submitted 176.4 million m³ of annual production. Competition lowered the reference prices.</description><enclosure url="https://feedstockdata.com/og/wpis-czech-biomethane-auction-oversubscribed-fourfold-176-4-million-m3.jpg" type="image/jpeg" length="0"/></item><item><title>India: a ten-year GOBARdhan programme worth 23,731 crore rupees with an administered price for CBG</title><link>https://feedstockdata.com/knowledge/india-new-gobardhan-programme-23731-crore-august-2026/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/india-new-gobardhan-programme-23731-crore-august-2026/</guid><pubDate>Wed, 12 Aug 2026 08:00:00 +0000</pubDate><category>Biomethane</category><description>On 6 August 2026 India's cabinet approved the GOBARdhan programme for 2026/27–2035/36: 23,731 crore rupees, an administered price of 2,110 rupees per MMBtu and subsidies for building CBG plants.</description><enclosure url="https://feedstockdata.com/og/wpis-india-new-gobardhan-programme-23731-crore-august-2026.jpg" type="image/jpeg" length="0"/></item><item><title>POB: biomethane is about 3.5 times more expensive than imported gas, but the money stays in Poland</title><link>https://feedstockdata.com/knowledge/pob-domestic-biomethane-costs-more-than-imported-gas-but-money-stays-in-poland/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/pob-domestic-biomethane-costs-more-than-imported-gas-but-money-stays-in-poland/</guid><pubDate>Tue, 02 Jun 2026 08:00:00 +0000</pubDate><category>Biomethane</category><description>A POB report compares the macroeconomic effects of gas imports and domestic biomethane production: 1 billion m³ of gas costs about PLN 1.52 billion from imports versus about PLN 5.53 billion for biomethane, which feeds domestic firms, farmers and budgets.</description><enclosure url="https://feedstockdata.com/og/wpis-pob-domestic-biomethane-costs-more-than-imported-gas-but-money-st.jpg" type="image/jpeg" length="0"/></item><item><title>Osaka Gas: the e-methane plant in Nagaoka has started trial operation and feeds the existing gas grid</title><link>https://feedstockdata.com/knowledge/osaka-gas-nagaoka-e-methane-test-plant-2026/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/osaka-gas-nagaoka-e-methane-test-plant-2026/</guid><pubDate>Fri, 08 May 2026 08:00:00 +0000</pubDate><category>Biomethane</category><description>Osaka Gas reported that since February 2026 it has been testing in Nagaoka (Niigata) an e-methane plant built with Inpex and has begun injecting synthetic gas into the grid. The plan: 1% in fiscal year 2030.</description><enclosure url="https://feedstockdata.com/og/wpis-osaka-gas-nagaoka-e-methane-test-plant-2026.jpg" type="image/jpeg" length="0"/></item><item><title>Quebec: a mandatory share of biomethane in the gas grid — from 1% in 2020 to 10% in 2030</title><link>https://feedstockdata.com/knowledge/quebec-mandatory-rng-share-gas-distributors-analysis/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/quebec-mandatory-rng-share-gas-distributors-analysis/</guid><pubDate>Mon, 04 May 2026 08:00:00 +0000</pubDate><category>Biomethane</category><description>An analysis of the Quebec regulation forcing a share of RNG in distributed gas: 1% from 2020, interim targets and 10% in 2030 (according to IEDM 2032 in brackets), and discrepancies over the timetable and delivery.</description><enclosure url="https://feedstockdata.com/og/wpis-quebec-mandatory-rng-share-gas-distributors-analysis.jpg" type="image/jpeg" length="0"/></item><item><title>The Commission approved a Czech EUR 3.7 billion scheme for biomethane</title><link>https://feedstockdata.com/knowledge/commission-approves-czech-eur-3-7-billion-biomethane-scheme/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/commission-approves-czech-eur-3-7-billion-biomethane-scheme/</guid><pubDate>Wed, 15 Apr 2026 08:00:00 +0000</pubDate><category>Biomethane</category><description>On 14 April 2026 the European Commission approved a Czech aid scheme worth EUR 3.7 billion: two-way contracts for difference for 15 years, a target of 350 million Nm³ of biomethane by the end of 2030, competitive tenders.</description><enclosure url="https://feedstockdata.com/og/wpis-commission-approves-czech-eur-3-7-billion-biomethane-scheme.jpg" type="image/jpeg" length="0"/></item><item><title>Ukraine launched a national biomethane register for exports to the EU</title><link>https://feedstockdata.com/knowledge/ukraine-launches-national-biomethane-register-for-eu-exports/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/ukraine-launches-national-biomethane-register-for-eu-exports/</guid><pubDate>Mon, 23 Feb 2026 08:00:00 +0000</pubDate><category>Biomethane</category><description>In February 2026 Ukraine’s Energy Efficiency Agency launched a national biomethane register: it tracks the origin of gas and issues and cancels guarantees of origin. In 2025 Ukraine exported biomethane to the EU for the first time.</description><enclosure url="https://feedstockdata.com/og/wpis-ukraine-launches-national-biomethane-register-for-eu-exports.jpg" type="image/jpeg" length="0"/></item><item><title>Second FEnIKS call: PLN 300 million for biomethane and biogas plants</title><link>https://feedstockdata.com/knowledge/second-feniks-call-pln-300-million-for-biomethane-and-biogas-plants/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/second-feniks-call-pln-300-million-for-biomethane-and-biogas-plants/</guid><pubDate>Mon, 02 Feb 2026 08:00:00 +0000</pubDate><category>Biomethane</category><description>NFOŚiGW has launched the second call under the FEnIKS programme (RES Development) with a pool of PLN 300 million: PLN 200 million for biomethane plants and PLN 100 million for biogas plants. Applications can be submitted until 30 April 2026.</description><enclosure url="https://feedstockdata.com/og/wpis-second-feniks-call-pln-300-million-for-biomethane-and-biogas-plan.jpg" type="image/jpeg" length="0"/></item><item><title>POB: 122 biomethane projects in Poland, and Biorig announces 20 installations</title><link>https://feedstockdata.com/knowledge/pob-122-biomethane-projects-in-poland-and-biorig-plan-for-20-plants/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/pob-122-biomethane-projects-in-poland-and-biorig-plan-for-20-plants/</guid><pubDate>Mon, 29 Dec 2025 08:00:00 +0000</pubDate><category>Biomethane</category><description>POB report from the end of 2025: 122 biomethane projects in preparation, about 815 million Nm³ per year, mostly 1–5 MW. Spain’s Biorig announced 20 biomethane plants and more than PLN 1.5 billion of investment.</description><enclosure url="https://feedstockdata.com/og/wpis-pob-122-biomethane-projects-in-poland-and-biorig-plan-for-20-plan.jpg" type="image/jpeg" length="0"/></item><item><title>Latvia approved a biomethane support package: EUR 21.5 million</title><link>https://feedstockdata.com/knowledge/latvia-approves-eur-21-5-million-biomethane-support-package/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/latvia-approves-eur-21-5-million-biomethane-support-package/</guid><pubDate>Wed, 19 Nov 2025 08:00:00 +0000</pubDate><category>Biomethane</category><description>On 18 November 2025 the Latvian government approved a EUR 21.5 million support package for biomethane production: a capital grant of up to EUR 4.2 million per applicant, plus ALTUM loans and guarantees.</description><enclosure url="https://feedstockdata.com/og/wpis-latvia-approves-eur-21-5-million-biomethane-support-package.jpg" type="image/jpeg" length="0"/></item><item><title>Poland's first grid-connected biomethane plant has started. Strzelin sugar factory</title><link>https://feedstockdata.com/knowledge/first-grid-connected-biomethane-plant-in-poland-starts-strzelin-sugar-factory/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/first-grid-connected-biomethane-plant-in-poland-starts-strzelin-sugar-factory/</guid><pubDate>Wed, 10 Sep 2025 08:00:00 +0000</pubDate><category>Biomethane</category><description>On 9 September 2025 Polska Spółka Gazownictwa announced the start-up of a biomethane plant at the Südzucker Polska sugar factory in Strzelin – the first in the country connected to the gas grid. Surplus biomethane reaches the grid through a 9-kilometre pipeline.</description><enclosure url="https://feedstockdata.com/og/wpis-first-grid-connected-biomethane-plant-in-poland-starts-strzelin-s.jpg" type="image/jpeg" length="0"/></item><item><title>Naturgy has connected Navarre's first biomethane plant. Pig slurry and 22 GWh a year</title><link>https://feedstockdata.com/knowledge/naturgy-connects-navarre-first-biomethane-plant-pig-slurry-22-gwh/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/naturgy-connects-navarre-first-biomethane-plant-pig-slurry-22-gwh/</guid><pubDate>Fri, 08 Aug 2025 08:00:00 +0000</pubDate><category>Biomethane</category><description>The operator Nedgia (Naturgy) has connected to the grid a biomethane plant in Cabanillas in Navarre: injection capacity of 320 Nm³/h, up to 22 GWh a year, with feedstock mainly pig slurry. It is the 12th injection point on the Nedgia (Naturgy) network in Spain.</description><enclosure url="https://feedstockdata.com/og/wpis-naturgy-connects-navarre-first-biomethane-plant-pig-slurry-22-gwh.jpg" type="image/jpeg" length="0"/></item><item><title>Blunomy and ENA report: Australia could recover about 400 PJ of biomethane per year</title><link>https://feedstockdata.com/knowledge/australia-blunomy-ena-report-biomethane-400-pj-2025/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/australia-blunomy-ena-report-biomethane-400-pj-2025/</guid><pubDate>Mon, 04 Aug 2025 08:00:00 +0000</pubDate><category>Biomethane</category><description>A Blunomy report for Energy Networks Australia (31 July 2025) estimates the biomethane potential at about 400 PJ per year; the first 50 PJ could cost AUD 10–27/GJ.</description><enclosure url="https://feedstockdata.com/og/wpis-australia-blunomy-ena-report-biomethane-400-pj-2025.jpg" type="image/jpeg" length="0"/></item><item><title>A biomethane plant step by step: the project schedule from idea to commissioning</title><link>https://feedstockdata.com/knowledge/biomethane-plant-step-by-step-project-schedule-from-idea-to-commissioning/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/biomethane-plant-step-by-step-project-schedule-from-idea-to-commissioning/</guid><pubDate>Mon, 17 Feb 2025 08:00:00 +0000</pubDate><category>Biomethane</category><description>Building a biomethane plant usually takes two to three years. We present the stages: site, study, connection conditions, environmental decisions, financing, construction, commissioning and certification, with typical durations and risks.</description><enclosure url="https://feedstockdata.com/og/wpis-biomethane-plant-step-by-step-project-schedule-from-idea-to-commi.jpg" type="image/jpeg" length="0"/></item><item><title>Nortegas: up to EUR 80 million of financing for biomethane plants in Spain</title><link>https://feedstockdata.com/knowledge/nortegas-secures-up-to-eur-80-million-for-spanish-biomethane-plants/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/nortegas-secures-up-to-eur-80-million-for-spanish-biomethane-plants/</guid><pubDate>Fri, 29 Nov 2024 08:00:00 +0000</pubDate><category>Biomethane</category><description>The Nortegas group has obtained, under InvestEU and the European Investment Bank, framework financing of up to EUR 80 million for the construction of biomethane plants in Spain, fed mainly with slurry.</description><enclosure url="https://feedstockdata.com/og/wpis-nortegas-secures-up-to-eur-80-million-for-spanish-biomethane-plan.jpg" type="image/jpeg" length="0"/></item><item><title>Firstgas and Ecogas: first biomethane flows through New Zealand's gas grid</title><link>https://feedstockdata.com/knowledge/firstgas-ecogas-reporoa-first-biomethane-in-new-zealand-grid/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/firstgas-ecogas-reporoa-first-biomethane-in-new-zealand-grid/</guid><pubDate>Fri, 08 Nov 2024 08:00:00 +0000</pubDate><category>Biomethane</category><description>In November 2024 First Renewables (Firstgas group) and Ecogas announced the start of injecting renewable gas from Reporoa into the grid – New Zealand's first commercial biogas-to-pipeline project.</description><enclosure url="https://feedstockdata.com/og/wpis-firstgas-ecogas-reporoa-first-biomethane-in-new-zealand-grid.jpg" type="image/jpeg" length="0"/></item><item><title>Methanation and power-to-gas with biogenic CO₂: the catalytic and biological methods</title><link>https://feedstockdata.com/knowledge/methanation-and-power-to-gas-with-biogenic-co2-catalytic-and-biological/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/methanation-and-power-to-gas-with-biogenic-co2-catalytic-and-biological/</guid><pubDate>Thu, 07 Nov 2024 08:00:00 +0000</pubDate><category>Biomethane</category><description>Methanation combines hydrogen from electrolysis with CO₂ from biogas to give synthetic methane. We compare the catalytic (Sabatier) and biological methods, the energy balance and the place of the process in a biomethane plant.</description><enclosure url="https://feedstockdata.com/og/wpis-methanation-and-power-to-gas-with-biogenic-co2-catalytic-and-biol.jpg" type="image/jpeg" length="0"/></item><item><title>Brazil: the "Fuel of the Future" law introduces biomethane targets in gas trading</title><link>https://feedstockdata.com/knowledge/brazil-fuel-of-the-future-law-biomethane-targets-in-gas-trading/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/brazil-fuel-of-the-future-law-biomethane-targets-in-gas-trading/</guid><pubDate>Wed, 09 Oct 2024 08:00:00 +0000</pubDate><category>Biomethane</category><description>On 8 October 2024 Law No. 14.993 "Combustível do Futuro" entered into force in Brazil. It introduces, among other things, gradual emission reduction targets in natural gas trading through a share of biomethane, from 1% in 2026.</description><enclosure url="https://feedstockdata.com/og/wpis-brazil-fuel-of-the-future-law-biomethane-targets-in-gas-trading.jpg" type="image/jpeg" length="0"/></item><item><title>Family biomethane plant in Masovia: farmers and agriKomp build an installation next to a gas pipeline</title><link>https://feedstockdata.com/knowledge/family-biomethane-plant-in-masovia-agrikomp-ostrow-mazowiecka/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/family-biomethane-plant-in-masovia-agrikomp-ostrow-mazowiecka/</guid><pubDate>Mon, 23 Sep 2024 08:00:00 +0000</pubDate><category>Biomethane</category><description>Three farmers from one family in the municipality of Ostrów Mazowiecka and agriKomp Polska are building a biomethane plant using slurry from over 1,500 dairy cows; construction start in autumn 2024, grid connection planned for summer 2025.</description><enclosure url="https://feedstockdata.com/og/wpis-family-biomethane-plant-in-masovia-agrikomp-ostrow-mazowiecka.jpg" type="image/jpeg" length="0"/></item><item><title>E-methane in Japan: a target of 1% in city gas by 2030 and 90% by 2050</title><link>https://feedstockdata.com/knowledge/japan-e-methane-city-gas-1-percent-2030-90-percent-2050-explained/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/japan-e-methane-city-gas-1-percent-2030-90-percent-2050-explained/</guid><pubDate>Fri, 20 Sep 2024 08:00:00 +0000</pubDate><category>Biomethane</category><description>Japanese gas companies intend to replace part of city gas with e-methane – synthetic methane from hydrogen and CO₂. The targets (1% in 2030, about 90% in 2050 according to METI), projects and limitations of this decarbonisation route.</description><enclosure url="https://feedstockdata.com/og/wpis-japan-e-methane-city-gas-1-percent-2030-90-percent-2050-explained.jpg" type="image/jpeg" length="0"/></item><item><title>Polish biomethane: potential of up to 16 billion m³ and barriers. POB data from 2024</title><link>https://feedstockdata.com/knowledge/polish-biomethane-potential-up-to-16-billion-m3-and-barriers-pob-2024-data/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/polish-biomethane-potential-up-to-16-billion-m3-and-barriers-pob-2024-data/</guid><pubDate>Mon, 02 Sep 2024 08:00:00 +0000</pubDate><category>Biomethane</category><description>According to the Polish Biomethane Organisation, the theoretical biomethane potential in Poland is up to 16 billion m³ a year, realistically about 9 billion m³. In 2023 there were 388 biogas plants and not a single biomethane plant.</description><enclosure url="https://feedstockdata.com/og/wpis-polish-biomethane-potential-up-to-16-billion-m3-and-barriers-pob.jpg" type="image/jpeg" length="0"/></item><item><title>NFOŚiGW consults on a biomethane programme: up to PLN 4 billion from the Modernisation Fund</title><link>https://feedstockdata.com/knowledge/nfosigw-consults-biomethane-programme-up-to-pln-4-billion-modernisation-fund/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/nfosigw-consults-biomethane-programme-up-to-pln-4-billion-modernisation-fund/</guid><pubDate>Tue, 16 Jul 2024 08:00:00 +0000</pubDate><category>Biomethane</category><description>NFOŚiGW sent for consultation a draft programme "Improving energy security through the use of biomethane": up to PLN 4 billion (PLN 2 billion in grants and PLN 2 billion in loans) for 2024–2030.</description><enclosure url="https://feedstockdata.com/og/wpis-nfosigw-consults-biomethane-programme-up-to-pln-4-billion-moderni.jpg" type="image/jpeg" length="0"/></item><item><title>Ireland publishes its National Biomethane Strategy with a target of 5.7 TWh by 2030</title><link>https://feedstockdata.com/knowledge/ireland-publishes-national-biomethane-strategy-5-7-twh-by-2030/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/ireland-publishes-national-biomethane-strategy-5-7-twh-by-2030/</guid><pubDate>Tue, 28 May 2024 08:00:00 +0000</pubDate><category>Biomethane</category><description>On 28 May 2024 the Irish government adopted the National Biomethane Strategy. It envisages up to 5.7 TWh of biomethane in 2030, about 10% of national gas demand.</description><enclosure url="https://feedstockdata.com/og/wpis-ireland-publishes-national-biomethane-strategy-5-7-twh-by-2030.jpg" type="image/jpeg" length="0"/></item><item><title>Ukraine: president signs law on customs clearance of biomethane</title><link>https://feedstockdata.com/knowledge/ukraine-president-signs-law-on-customs-clearance-of-biomethane/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/ukraine-president-signs-law-on-customs-clearance-of-biomethane/</guid><pubDate>Thu, 16 May 2024 08:00:00 +0000</pubDate><category>Biomethane</category><description>On 14 May 2024 the President of Ukraine signed Law No. 3613-IX, which allows customs clearance of biomethane transported by pipeline. It is a step towards exporting Ukrainian biomethane to the EU.</description><enclosure url="https://feedstockdata.com/og/wpis-ukraine-president-signs-law-on-customs-clearance-of-biomethane.jpg" type="image/jpeg" length="0"/></item><item><title>Converting a biogas plant with cogeneration into a biomethane plant (retrofit): step by step</title><link>https://feedstockdata.com/knowledge/converting-a-chp-biogas-plant-into-a-biomethane-plant-retrofit-step-by-step/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/converting-a-chp-biogas-plant-into-a-biomethane-plant-retrofit-step-by-step/</guid><pubDate>Wed, 17 Apr 2024 08:00:00 +0000</pubDate><category>Biomethane</category><description>A biogas plant with a CHP engine can be converted into a biomethane plant by adding upgrading and a grid connection. We indicate what needs to be calculated: biogas, heat for digestion, support, permits and the schedule.</description><enclosure url="https://feedstockdata.com/og/wpis-converting-a-chp-biogas-plant-into-a-biomethane-plant-retrofit-st.jpg" type="image/jpeg" length="0"/></item><item><title>UK extends Green Gas Support Scheme to March 2028</title><link>https://feedstockdata.com/knowledge/uk-extends-green-gas-support-scheme-to-2028/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/uk-extends-green-gas-support-scheme-to-2028/</guid><pubDate>Fri, 26 Jan 2024 08:00:00 +0000</pubDate><category>Biomethane</category><description>Following its mid-term review, the UK government announced an extension to 31 March 2028 of the application period for the tariff scheme for biomethane injected into the grid. The rules for heat pumps have also changed.</description><enclosure url="https://feedstockdata.com/og/wpis-uk-extends-green-gas-support-scheme-to-2028.jpg" type="image/jpeg" length="0"/></item><item><title>The biomethane reference price is here: PLN 538/MWh from biogas and PLN 545/MWh from agricultural biogas</title><link>https://feedstockdata.com/knowledge/biomethane-reference-price-pln-538-545-per-mwh-regulation-november-2023/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/biomethane-reference-price-pln-538-545-per-mwh-regulation-november-2023/</guid><pubDate>Tue, 14 Nov 2023 08:00:00 +0000</pubDate><category>Biomethane</category><description>The regulation of the minister of climate of 13 November 2023 sets the biomethane reference price: PLN 538/MWh for biomethane from biogas and PLN 545/MWh for biomethane from agricultural biogas. It enters into force on 22 November.</description><enclosure url="https://feedstockdata.com/og/wpis-biomethane-reference-price-pln-538-545-per-mwh-regulation-novembe.jpg" type="image/jpeg" length="0"/></item><item><title>Korea: KIER upgrades biogas to over 97% methane in a pilot plant</title><link>https://feedstockdata.com/knowledge/korea-kier-biogas-upgrading-97-percent-methane-pilot-2023/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/korea-kier-biogas-upgrading-97-percent-methane-pilot-2023/</guid><pubDate>Wed, 13 Sep 2023 08:00:00 +0000</pubDate><category>Biomethane</category><description>The Korea Institute of Energy Research (KIER) developed a process for removing H₂S, CO₂ and moisture from biogas from food waste and slurry; the pilot processed an average of 3 t of biogas per day.</description><enclosure url="https://feedstockdata.com/og/wpis-korea-kier-biogas-upgrading-97-percent-methane-pilot-2023.jpg" type="image/jpeg" length="0"/></item><item><title>Amendment of the Act on Renewable Energy Sources: definition of biomethane, producer register, guarantees of origin, support up to 1 MW</title><link>https://feedstockdata.com/knowledge/res-act-amendment-august-2023-biomethane-register-guarantees-support/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/res-act-amendment-august-2023-biomethane-register-guarantees-support/</guid><pubDate>Thu, 31 Aug 2023 08:00:00 +0000</pubDate><category>Biomethane</category><description>The act of 17 August 2023 introduces into Polish law a definition of biomethane, a register of biogas producers at the Energy Regulatory Office (URE), guarantees of origin and a support system for biomethane from installations of up to 1 MW (20 years).</description><enclosure url="https://feedstockdata.com/og/wpis-res-act-amendment-august-2023-biomethane-register-guarantees-supp.jpg" type="image/jpeg" length="0"/></item><item><title>Injection into the transmission grid versus the distribution grid: pressure levels and reverse compression</title><link>https://feedstockdata.com/knowledge/injection-into-transmission-vs-distribution-grids-pressures-reverse-compression/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/injection-into-transmission-vs-distribution-grids-pressures-reverse-compression/</guid><pubDate>Thu, 20 Jul 2023 08:00:00 +0000</pubDate><category>Biomethane</category><description>The distribution grid has limited absorption capacity, especially in summer, so biomethane is sometimes injected into a higher-pressure grid or via reverse compression. We explain pressure levels, the choice of injection point and the criteria.</description><enclosure url="https://feedstockdata.com/og/wpis-injection-into-transmission-vs-distribution-grids-pressures-rever.jpg" type="image/jpeg" length="0"/></item><item><title>Biomethane in South Africa: what the 2023 review says about biogas upgrading and commercialisation</title><link>https://feedstockdata.com/knowledge/south-africa-biomethane-biogas-upgrading-review-2023/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/south-africa-biomethane-biogas-upgrading-review-2023/</guid><pubDate>Mon, 17 Jul 2023 08:00:00 +0000</pubDate><category>Biomethane</category><description>A review in the journal Energies (July 2023) analyses biogas upgrading methods in South Africa and estimates the potential at 3 million Nm³ of biogas a day. In 2022 the industry put biogas capacity at about 30 MW.</description><enclosure url="https://feedstockdata.com/og/wpis-south-africa-biomethane-biogas-upgrading-review-2023.jpg" type="image/jpeg" length="0"/></item><item><title>Malabar: the first biomethane injected into a gas grid in Australia</title><link>https://feedstockdata.com/knowledge/malabar-first-biomethane-injected-into-the-gas-grid-in-australia/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/malabar-first-biomethane-injected-into-the-gas-grid-in-australia/</guid><pubDate>Tue, 20 Jun 2023 08:00:00 +0000</pubDate><category>Biomethane</category><description>In June 2023 Jemena and Sydney Water injected into the New South Wales grid the first biomethane from the Malabar treatment plant – the start of a 14 million AUD project supported by ARENA.</description><enclosure url="https://feedstockdata.com/og/wpis-malabar-first-biomethane-injected-into-the-gas-grid-in-australia.jpg" type="image/jpeg" length="0"/></item><item><title>How to choose a biogas upgrading technology: a decision matrix for the investor</title><link>https://feedstockdata.com/knowledge/how-to-choose-a-biogas-upgrading-technology-decision-matrix-for-investors/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/how-to-choose-a-biogas-upgrading-technology-decision-matrix-for-investors/</guid><pubDate>Thu, 24 Nov 2022 08:00:00 +0000</pubDate><category>Biomethane</category><description>The choice of upgrading technology depends on a dozen or so criteria: scale, heat, the CO₂ market, methane losses, local conditions. We propose a matrix with weights and a scoring example for your own use.</description><enclosure url="https://feedstockdata.com/og/wpis-how-to-choose-a-biogas-upgrading-technology-decision-matrix-for-i.jpg" type="image/jpeg" length="0"/></item><item><title>Italy: biomethane decree published. Recovery plan funds for new installations and biogas plant conversions</title><link>https://feedstockdata.com/knowledge/italy-biomethane-decree-340-2022-pnrr-published-26-october/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/italy-biomethane-decree-340-2022-pnrr-published-26-october/</guid><pubDate>Wed, 26 Oct 2022 08:00:00 +0000</pubDate><category>Biomethane</category><description>On 26 October 2022 Italy published MITE Decree No 340 of 15 September 2022 on support for biomethane: EUR 1.7 billion from the PNRR and tariffs for installations injecting biomethane into the grid.</description><enclosure url="https://feedstockdata.com/og/wpis-italy-biomethane-decree-340-2022-pnrr-published-26-october.jpg" type="image/jpeg" length="0"/></item><item><title>Biomethane Industrial Partnership launched: the Commission and industry together for 35 billion m³ of biomethane</title><link>https://feedstockdata.com/knowledge/biomethane-industrial-partnership-launch-28-september-2022/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/biomethane-industrial-partnership-launch-28-september-2022/</guid><pubDate>Wed, 28 Sep 2022 08:00:00 +0000</pubDate><category>Biomethane</category><description>On 28 September 2022 the European Commission and industry leaders launched the Biomethane Industrial Partnership (BIP), a cooperation platform intended to help reach the target of 35 billion m³ of biomethane by 2030.</description><enclosure url="https://feedstockdata.com/og/wpis-biomethane-industrial-partnership-launch-28-september-2022.jpg" type="image/jpeg" length="0"/></item><item><title>Air Liquide launches a biomethane business in China. The first project is in Jiangsu province</title><link>https://feedstockdata.com/knowledge/air-liquide-first-biomethane-project-in-china-huaian/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/air-liquide-first-biomethane-project-in-china-huaian/</guid><pubDate>Mon, 18 Jul 2022 08:00:00 +0000</pubDate><category>Biomethane</category><description>Air Liquide announced China's first biomethane project from agricultural and livestock waste in Huai'an, with annual production of about 75 GWh and injection into the city gas network.</description><enclosure url="https://feedstockdata.com/og/wpis-air-liquide-first-biomethane-project-in-china-huaian.jpg" type="image/jpeg" length="0"/></item><item><title>REPowerEU: the Commission bets on biomethane – a target of 35 billion m³ a year by 2030</title><link>https://feedstockdata.com/knowledge/repowereu-plan-biomethane-35-bcm-by-2030/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/repowereu-plan-biomethane-35-bcm-by-2030/</guid><pubDate>Wed, 18 May 2022 08:00:00 +0000</pubDate><category>Biomethane</category><description>On 18 May 2022 the European Commission presented the REPowerEU plan with a target of 35 billion m³ of biomethane a year by 2030 and a biomethane action plan, including an industrial partnership and support from the CAP.</description><enclosure url="https://feedstockdata.com/og/wpis-repowereu-plan-biomethane-35-bcm-by-2030.jpg" type="image/jpeg" length="0"/></item><item><title>Raízen builds a vinasse biomethane plant in Piracicaba: 26 million m³ a year and contracts with Yara and Volkswagen</title><link>https://feedstockdata.com/knowledge/raizen-piracicaba-vinasse-biomethane-plant-26-million-m3/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/raizen-piracicaba-vinasse-biomethane-plant-26-million-m3/</guid><pubDate>Fri, 29 Apr 2022 08:00:00 +0000</pubDate><category>Biomethane</category><description>In April 2022 Raízen announced the construction of its second biogas plant, the first dedicated to biomethane: R$ 300 million, 26 million m³ a year from vinasse and filter cake, sold to Yara and Volkswagen.</description><enclosure url="https://feedstockdata.com/og/wpis-raizen-piracicaba-vinasse-biomethane-plant-26-million-m3.jpg" type="image/jpeg" length="0"/></item><item><title>Virtual pipeline: how to deliver biomethane without a grid in tankers and cylinder sets</title><link>https://feedstockdata.com/knowledge/virtual-pipeline-delivering-biomethane-without-a-grid-in-tankers-and-cylinders/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/virtual-pipeline-delivering-biomethane-without-a-grid-in-tankers-and-cylinders/</guid><pubDate>Fri, 25 Feb 2022 08:00:00 +0000</pubDate><category>Biomethane</category><description>A virtual pipeline is the delivery of compressed or liquefied biomethane by road. We explain the arrangement, capacities, transport costs per kilometre and the profitability limit.</description><enclosure url="https://feedstockdata.com/og/wpis-virtual-pipeline-delivering-biomethane-without-a-grid-in-tankers.jpg" type="image/jpeg" length="0"/></item><item><title>British Columbia: FortisBC targets 15% renewable gas by 2030 and proposes RNG for new homes</title><link>https://feedstockdata.com/knowledge/british-columbia-fortisbc-15-percent-renewable-gas-2030-rng-new-homes/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/british-columbia-fortisbc-15-percent-renewable-gas-2030-rng-new-homes/</guid><pubDate>Mon, 31 Jan 2022 08:00:00 +0000</pubDate><category>Biomethane</category><description>On 20 January 2022 FortisBC applied to the regulator to supply 100% renewable gas to all new homes; the company is on track to exceed its target of 15% renewable gas by 2030.</description><enclosure url="https://feedstockdata.com/og/wpis-british-columbia-fortisbc-15-percent-renewable-gas-2030-rng-new-h.jpg" type="image/jpeg" length="0"/></item><item><title>Denmark: biomethane is already nearly a quarter of the gas in the grid. A record at the end of 2021</title><link>https://feedstockdata.com/knowledge/denmark-biomethane-nearly-25-percent-of-grid-gas/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/denmark-biomethane-nearly-25-percent-of-grid-gas/</guid><pubDate>Mon, 10 Jan 2022 08:00:00 +0000</pubDate><category>Biomethane</category><description>The Danish operator Energinet reported that biomethane made up almost 25% of gas in the national grid at the end of 2021, compared with 21% a year earlier. Denmark sets the standard for countries building a biomethane market.</description><enclosure url="https://feedstockdata.com/og/wpis-denmark-biomethane-nearly-25-percent-of-grid-gas.jpg" type="image/jpeg" length="0"/></item><item><title>Gas package: definitions of renewable and low-carbon gases and easier access for biomethane</title><link>https://feedstockdata.com/knowledge/commission-gas-package-renewable-and-low-carbon-gases-15-december-2021/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/commission-gas-package-renewable-and-low-carbon-gases-15-december-2021/</guid><pubDate>Wed, 15 Dec 2021 08:00:00 +0000</pubDate><category>Biomethane</category><description>On 15 December 2021 the Commission proposed a directive and a regulation reforming the gas market: definitions of renewable and low-carbon gases, certification, easier grid access and tariff discounts for renewable gases.</description><enclosure url="https://feedstockdata.com/og/wpis-commission-gas-package-renewable-and-low-carbon-gases-15-december.jpg" type="image/jpeg" length="0"/></item><item><title>Connection conditions for a biomethane plant to the gas grid: stages, documents and analyses</title><link>https://feedstockdata.com/knowledge/connecting-a-biomethane-plant-to-the-gas-grid-stages-and-documents/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/connecting-a-biomethane-plant-to-the-gas-grid-stages-and-documents/</guid><pubDate>Wed, 08 Sep 2021 08:00:00 +0000</pubDate><category>Biomethane</category><description>From the application for connection conditions to acceptance: we describe the stages of connecting a biomethane plant to the gas grid, the analyses of capacity and costs, and the documents that need to be prepared.</description><enclosure url="https://feedstockdata.com/og/wpis-connecting-a-biomethane-plant-to-the-gas-grid-stages-and-document.jpg" type="image/jpeg" length="0"/></item><item><title>Italy: recovery plan approved, EUR 1.92 billion for biomethane development</title><link>https://feedstockdata.com/knowledge/italy-pnrr-approved-eur-1-92-billion-for-biomethane/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/italy-pnrr-approved-eur-1-92-billion-for-biomethane/</guid><pubDate>Tue, 13 Jul 2021 08:00:00 +0000</pubDate><category>Biomethane</category><description>The EU Council approved the Italian recovery plan on 13 July 2021. Investment M2C2 1.4 for biomethane development provides about EUR 1.92 billion and production of 2.3 billion m³ per year by mid-2026.</description><enclosure url="https://feedstockdata.com/og/wpis-italy-pnrr-approved-eur-1-92-billion-for-biomethane.jpg" type="image/jpeg" length="0"/></item><item><title>Beca, Firstgas and Fonterra report: biogas could cover about 20% of New Zealand's gas use by 2050</title><link>https://feedstockdata.com/knowledge/beca-firstgas-fonterra-biogas-20-percent-of-nz-gas-by-2050/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/beca-firstgas-fonterra-biogas-20-percent-of-nz-gas-by-2050/</guid><pubDate>Thu, 08 Jul 2021 08:00:00 +0000</pubDate><category>Biomethane</category><description>A Beca report prepared with Firstgas and Fonterra indicates that renewable gas could replace nearly 20% of national gas use by 2050 and avoid about 4% of energy emissions.</description><enclosure url="https://feedstockdata.com/og/wpis-beca-firstgas-fonterra-biogas-20-percent-of-nz-gas-by-2050.jpg" type="image/jpeg" length="0"/></item><item><title>Orlen Południe and PGNiG file an application with UOKiK for a biomethane company; Jeżewo in the plans</title><link>https://feedstockdata.com/knowledge/orlen-poludnie-pgnig-uokik-application-biomethane-company-jezewo/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/orlen-poludnie-pgnig-uokik-application-biomethane-company-jezewo/</guid><pubDate>Mon, 05 Jul 2021 08:00:00 +0000</pubDate><category>Biomethane</category><description>Orlen Południe and the Polish Oil and Gas Company (PGNiG) notified the Office of Competition and Consumer Protection (UOKiK) of their intention to create a 51/49 special purpose company. Among the planned projects is the expansion of the 1.8 MWe biogas plant in Jeżewo to 3.2 MWe and about 8 million m³ of biomethane.</description><enclosure url="https://feedstockdata.com/og/wpis-orlen-poludnie-pgnig-uokik-application-biomethane-company-jezewo.jpg" type="image/jpeg" length="0"/></item><item><title>Orlen Południe and PGNiG to build a network of biomethane plants: letter of intent and a joint 51/49 company</title><link>https://feedstockdata.com/knowledge/orlen-poludnie-and-pgnig-letter-of-intent-biomethane-plant-network/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/orlen-poludnie-and-pgnig-letter-of-intent-biomethane-plant-network/</guid><pubDate>Thu, 06 May 2021 08:00:00 +0000</pubDate><category>Biomethane</category><description>Orlen Południe and the Polish Oil and Gas Company (PGNiG) signed a letter of intent on a network of biomethane plants. The investments are to be carried out by a special purpose company in which Orlen Południe will take 51% of the shares and PGNiG 49%.</description><enclosure url="https://feedstockdata.com/og/wpis-orlen-poludnie-and-pgnig-letter-of-intent-biomethane-plant-networ.jpg" type="image/jpeg" length="0"/></item><item><title>Measuring the quality and quantity of biomethane at injection: chromatograph, gas meter, propane</title><link>https://feedstockdata.com/knowledge/biomethane-quality-and-quantity-measurement-chromatograph-gas-meter-propane/</link><guid isPermaLink="true">https://feedstockdata.com/knowledge/biomethane-quality-and-quantity-measurement-chromatograph-gas-meter-propane/</guid><pubDate>Sun, 25 Apr 2021 08:00:00 +0000</pubDate><category>Biomethane</category><description>Biomethane is settled on the basis of energy: a gas meter measures the volume and a chromatograph the calorific value. We describe the metering system, propane for calorific correction and quality supervision.</description><enclosure url="https://feedstockdata.com/og/wpis-biomethane-quality-and-quantity-measurement-chromatograph-gas-met.jpg" type="image/jpeg" length="0"/></item></channel></rss>
