Fire protection at biogas plants: distances, fire access roads, water supply and expert review

A biogas plant needs solutions built into the design: distances, fire access roads, firefighting water and a fire safety instruction. Who approves what at the design stage.

Published 5 min readFeedstockData Editorial Team

Other language versions: Polski, Deutsch, Español, Français, Italiano, Nederlands.

Lotnicze ujęcie biogazowni z zielonym zbiornikiem i dwiema halami z panelami słonecznymi na dachach.
Photo Martina Nolte / Wikimedia Commons, licence CC BY-SA 3.0 de, source file; changes: cropping

Fire protection at a biogas plant starts at the design stage, not at the moment of buying fire extinguishers. Distances from the plot boundary and other structures, the width of access roads, the amount of firefighting water and the division into fire compartments are set once, and a change to a completed installation is expensive or impossible. This text deals with the formal and design side; the causes of fires and firefighting are covered in separate articles.

In Poland, fire protection requirements for buildings and structures follow from the Act on Fire Protection (ustawa o ochronie przeciwpożarowej), from the regulation of the minister responsible for internal affairs on fire protection of buildings, other structures and land (of 2010, as amended), and from the technical conditions that buildings and their siting must meet. There is no single dedicated act for biogas plants; the general regulations apply, and for particular elements, such as gas tanks, the solutions require interpretation and agreement. The regulations are amended from time to time, so the scope of requirements for a given investment is confirmed with the designer and the expert, on the basis of the current legal status.

Distances and siting

The layout of structures takes into account several kinds of distances: from the plot boundary and neighbouring buildings, between structures of different hazard categories (biogas tanks, CHP engine room, substrate store, silos, transformer station, oil store), and distances resulting from explosion hazard zones. The latter are determined by the explosion protection document and do not always coincide with fire protection distances; both sets of requirements must be met. The position of the gas tank in relation to vehicle traffic, power lines and residential buildings is considered even before the detailed design.

In practice, the safe layouts are those in which the engine room with the engines and switchboard stands outside the explosion hazard zones and away from the tanks, and silage clamps and straw stores, that is, a large fire load, are kept away from process elements.

Fire access roads and manoeuvring areas

The site must have access for rescue vehicles. The regulations specify the parameters of a fire access road: width, bearing capacity of the surface, curve radii, gradient, as well as requirements for a manoeuvring area and turning. The values depend on the category of the facility and the regulations in force at the time of design; they should be verified. The most common problems at agricultural biogas plants are an internal road blocked by machinery or clamps, a gate locked so that the fire brigade cannot open it, and no marking of which part of the installation is at risk of explosion.

Firefighting water supply

External water supply for firefighting can be provided from the water mains (external hydrants), and where the network does not provide the required capacity or there is none, from fire-protection tanks, ponds or wells with a draw-off point for vehicles. The required flow rate and quantity of water depend on the area and hazard category of the structures and follow from the regulation; it is assumed that the expert will indicate the appropriate values for the installation. The draw-off point should be marked, accessible in all conditions (in winter too) and regularly checked for capacity and clear passage.

It is worth remembering that in a fire involving a biogas tank, the fire brigade's strategy usually consists of cooling neighbouring structures and protecting against the spread of fire, not extinguishing the burning gas; water is therefore needed mainly for cooling.

The expert and design approvals

The building design of structures for which the regulations require it is approved by a fire protection expert (rzeczoznawca do spraw zabezpieczeń przeciwpożarowych). The approval covers, among other things, the adopted fire resistance classes, fire compartments, escape routes, fire access roads, water supply and installations (e.g. smoke extraction and a fire alarm system, if required). It is sensible to invite the expert at the concept stage and show the Ex document: reconciling conflicting requirements after the design is finished is costly.

A fire expert review of an existing installation, commissioned e.g. on expansion or at the insurer's request, assesses the conformity of the actual state with the requirements and gives remedial recommendations.

Fire safety instruction and cooperation with the fire brigade

The owner or manager of a facility where the law requires it prepares a fire safety instruction, updates it after changes of use or technology and trains employees in its rules. The instruction contains, among other things: the fire protection conditions, procedures in case of fire, rules for hot work, firefighting equipment and evacuation rules.

Good practices that do not follow directly from the regulations but make an operation easier: a site plan marked with the Ex zones, gas shut-off valves and water points, handed to the local fire brigade unit; a joint familiarisation with the specifics of a biogas plant; a key box at the gate; and marking of the site consistent with the design.

Typical mistakes

  • The fire protection design and the explosion protection document prepared independently, with conflicting solutions.
  • A fire-protection tank with no way of drawing water in winter.
  • Fire extinguishers of the wrong type or not inspected.
  • A change to the layout of the site (new silos, clamps) without updating the documents.

Checklist

Does the design have the expert's approval? Is the fire access road passable all year round? Is the water draw-off point in working order and marked? Is the fire safety instruction up to date? Does the fire brigade know the site and have its plan?

Sources