
Will a heating cable protect the system from frost?
A heating cable protects the system from frost only if it is matched to the conditions, insulated, powered and monitored. When it fails and how to check.

A biogas plant's result is decided by day-to-day operation: process stability, monitoring, equipment servicing and safety.
RSSDigesters, mixing, heating, desulphurisation, measurement, automation, cogeneration, servicing and safety (ATEX).

A heating cable protects the system from frost only if it is matched to the conditions, insulated, powered and monitored. When it fails and how to check.

Methane escapes through roof valves, leaks, digestate stores, upgrading and unburned gas in the CHP. How to detect, measure and reduce it, and what the EU Methane Regulation means.

How to implement OGI: when to buy a camera, when to rent one and when to commission an inspection — and what follows from Regulation (EU) 2024/1787, what the good practices for biogas plants are and how to choose a supplier.

BZK Energy has commissioned Tesgas to build a 20 km medium-pressure pipeline to the Ambassador biomethane plant; it is to connect the installation to the GAZ-SYSTEM transmission grid by the end of November 2027. Planned production: more than 5 million m³ of biomethane and about 4 million m³ of CO₂ per year (gas volume).

An overview of OGI solution categories: cooled and uncooled cameras, fixed, drone-mounted, quantitative (QOGI), software and Ex versions — and the parameters that actually differentiate the devices.

What OGI is, how a camera that "sees" methane works, when it fails, what leaks cost and which regulations (EU 2024/1787, EN 17628, EPA) apply to biogas plants, biomethane plants and landfills.

CHP availability, methane yield from VS, OLR, HRT, FOS/TAC, own consumption and heat utilisation: a set of indicators with formulas, response thresholds and an example of a monthly report.

What the cost of running a biogas plant consists of: substrates, CHP servicing, own energy, labour, insurance, digestate. How to calculate the cost per kWh and per m³ CH₄ and where to look for savings.

An overview of several documented projects: 6 MW of landfill gas at Nejapa (El Salvador), a 1 MW installation at a wastewater treatment plant in Managua, a small CHP unit in Costa Rica and the first biomethane installation in Cuba — and conclusions on scale.

The inside of a digester, a digestate tank or a manhole is a confined space in which people die. The procedure step by step: permit, ventilation, measurements, standby person, rescue.

The same daily mass of feed can provoke a different digester response, depending on how the doses are spread over time and on composition. We explain what the EPA AgSTAR guide says about this and how to keep records.

How to write an emergency plan that works at three in the morning: scenarios, responsibilities, alerting, gas shut-off and drills. A table of scenarios with actions.

Temperature, pH, FOS/TAC and digester loading determine fermentation stability. An overview of parameters, typical ranges and rules for gradually increasing the load in an agricultural biogas plant.

Co-digestion combines two or more substrates in one digester. We explain C:N, proven combinations, synergy and the rules for introducing new mixtures.

A biogas plant is subject to several types of inspection: technical supervision of equipment, building and electrical inspections, and safety tests. How to arrange them into a single schedule.

Fires at biogas plants most often start in the CHP unit, electrical installations, silage stores and dryers. An overview of causes, prevention, equipment and firefighting principles.

BMP, TS, VS, C:N and pH are the basic parameters of a substrate. We show how to assess sample quality, compare the cost of methane and avoid typical mistakes, using an example with explicit assumptions.

Zones 0, 1 and 2 define how often an explosive atmosphere occurs. We explain the classification principles, typical places at a biogas plant, and the role of ventilation and marking.

H₂S is a poisonous gas that dulls the sense of smell. We explain the effects depending on concentration, where it accumulates, how to choose detectors and what rules to apply during work.

Two ATEX directives: one for equipment manufacturers, the other for employers. What this means for the biogas plant operator, how the explosion protection document works and what to check.

Participants of the Grid Ready Forum, organised by the EBA, called on Member States and the Commission to quickly implement the right to inject biomethane from the gas package, connection time limits and grid zoning.

In Brody (the Agricultural Experimental Farm of the Poznań University of Life Sciences) a research biomethane plant with a capacity of 0.499 MWe has been built, producing about 650,000 m³ of biomethane a year as bioCNG. Technological start-up began at the end of 2024.

We explain what a covered digester lagoon is, when it works, how it differs from a complete-mix reactor and why it is the most numerous type of installation in AgSTAR listings.

The regulation of the Minister of Climate of 11 December 2023, published on 27 December, introduces a report template for small-installation energy producers and biogas or biomethane producers. It enters into force on 1 January 2024.