
Słupsk Bioenergy Island: sludge biogas, energy storage and a heat pump at a wastewater treatment plant
Construction of the Słupsk Bioenergy Island (Słupska Wyspa Bioenergetyczna) is under way at the wastewater treatment plant in Słupsk: sludge hydrolysis, a 2,700 m³ biogas tank, 1 MW cogeneration, 1 MW/2.4 MWh energy storage and a heat pump. Cost PLN 62.1 million, of which about PLN 37.25 million from the National Recovery and Resilience Plan (KPO).

























