A well-kept log is the cheapest diagnostic tool at a biogas plant. We show daily and weekly records and the difference between SCADA and the log.
Other language versions: Polski, Deutsch, Español, Français, Italiano, Nederlands.

The operator log is an organised record of what went into the plant, what came out of it and what a person did, and its value appears only when the cause of an event from weeks ago has to be reconstructed. The control system records numbers, but it does not record that someone replaced a sensor, changed the recipe or heard a worrying sound. This guide describes the minimum set of data and how to use it. The architecture of the control system is described in the article on biogas plant monitoring and automation, so here we focus on the work of the person.
The SCADA log and the event log: two different things
The control system records values continuously: temperatures, flows, pressures, operating states. These are measurement data. The event log contains information that sensors do not see: who changed a setpoint, when and why, what substrate was fed, whether there was a failure, what was noticed during the round. Good practice is for the two sources to complement each other: an entry in the log has a timestamp that makes it possible to find the corresponding section of the trend in SCADA.
Daily records
The minimum set worth recording every day (manually or as an export from the automation system):
- the mass of the feed by fraction (silage, slurry, manure, waste, other) and any recipe changes,
- biogas production (from the meter) and composition: CH₄, CO₂, O₂, H₂S,
- the temperatures of the digesters and the post-digester,
- the operating hours and energy production of the CHP unit,
- events: alarms, shutdowns, service interventions, parts replacements,
- the operator's signature or initials and the time of shift handover.
Weekly and periodic records
Some parameters change slowly and do not require daily measurement, but their trend is valuable:
- pH and the ratio of volatile acids to alkalinity,
- dry matter and organic matter content in the digester,
- laboratory analysis results (ammonia, volatile fatty acids),
- the condition of oils and filters and utility meter readings,
- checking the sludge level and the condition of the agitators.
A weekly summary in one table or spreadsheet gives a picture that cannot be seen by looking at a single day: for example a slow decline in CH₄ or rising oil consumption.
How to record so that it is useful
A few practical rules:
- Units and measurement point. An entry such as "gas production 3000" without a unit, or without information on whether it refers to m³ under normal conditions, is useless.
- A fixed format. The same order of fields and the same reading time make comparisons possible.
- An event always with a time. "The filter was replaced in the morning" is not enough; the time and the device number are needed.
- Separating facts from hypotheses. An observation (e.g. "bearing noise on agitator no. 2") and an interpretation ("worn bearing") should be kept apart, because a hypothesis changes, while an observation does not.
- Recording setpoint changes. Every parameter change, even a minor one, goes into the log.
Shift handover
With shift work, or when the operator is replaced by someone else, a short handover note reduces the risk of information being lost. It should contain: the state of the process, open problems, plans for the next few hours and events that may recur (e.g. unstable pump operation). For a plant with a single operator, this role is played by the end-of-day entry.
Using the data
The log should serve three purposes:
- Diagnostics. When production falls, it makes it possible to quickly check the feed, setpoint changes and events before the costly search for causes begins.
- Planning. The records of operating hours and parts consumption show when to plan inspections.
- Evidence. During an audit, an inspection or a conversation with warranty service, continuous documentation shows that the plant was operated in accordance with recommendations. The formal requirements for keeping records depend on the permits and the type of plant, so they should be checked in the documents of your own plant rather than relying on a general description.
Finally, a few practical remarks. A paper log is reliable and simple, but it is difficult to build trends from it; a spreadsheet makes charts easier, but requires discipline with backups. Whatever the form, it is worth reviewing the records once a month and asking whether something is slowly changing: oil consumption, heating operating hours, the share of fractions in the feed. Data that nobody reads loses its point; a short monthly review is enough for the log to start working for the operator, and not only for the documentation.
Key takeaways
A good log is short, kept daily and consistent. A simple spreadsheet that is always filled in is better than an elaborate system filled in sporadically. We record what the automation does not see: decisions, observations and changes. When a failure occurs, it is these notes that shorten the time to diagnosis.