Operation and failuresAnalysis

MTBF, MTTR and biogas plant availability: how to calculate and how to read the results

Plant availability is not the same as CHP engine running hours. We show how to calculate MTBF, MTTR and availability and how to avoid interpretation traps.

Published 4 min readFeedstockData Editorial Team

Other language versions: Polski, Deutsch, Español, Français, Italiano, Nederlands.

Trzy zielone zbiorniki fermentacyjne widziane z góry, obok pryzma kiszonki pod folią.
Photo Martina Nolte / Wikimedia Commons, licence CC BY-SA 3.0 de, source file; changes: cropping

Availability tells for what part of the time the plant is able to operate, and MTBF and MTTR are the two figures from which it is derived. Operators often use CHP engine running hours, but that is a narrower indicator and can be misleading. This text sorts out the definitions, shows calculations on hypothetical numbers and points out the traps. The full list of biogas plant indicators is discussed in a separate text on KPIs; here we focus on the methodology of one of them.

Definitions

  • MTBF (mean time between failures): the mean operating time between successive failures. It is calculated as the total operating time divided by the number of failures.
  • MTTR (mean time to repair): the mean repair time, counted from the occurrence of the failure to the restoration of the ability to operate. It includes diagnosis, waiting for a part, repair and restart.
  • Availability (A): A = MTBF / (MTBF + MTTR).

The formula makes sense for unplanned failures. Planned downtime, for example an inspection after a set number of hours, is treated separately.

Calculation example (hypothetical numbers)

Assume a calendar year, that is 8,760 hours. The plant had:

  • 6 unplanned failures with a total repair time of 120 hours,
  • 150 hours of planned downtime (inspections).

The time available for assessing failure rate is 8,760 − 150 = 8,610 hours. The operating time between failures is 8,610 − 120 = 8,490 hours. Therefore MTBF = 8,490 / 6 ≈ 1,415 hours, MTTR = 120 / 6 = 20 hours. Availability is 1,415 / (1,415 + 20) ≈ 98.6%. If planned downtime is also taken into account, availability relative to the whole year is (8,760 − 150 − 120) / 8,760 ≈ 96.9%. Both figures are correct, but they answer different questions, so always state how it was calculated.

CHP running hours versus plant availability

An engine can run for 8,000 hours a year and the plant can still be in poor condition: an agitator stood for weeks, a feeder was faulty, and gas production fell, so the engine ran at reduced load. Conversely: the engine is stopped by a grid failure, and the plant is fully operational. That is why it is worth tracking availability at the level of subsystems: dosing, mixing, the gas system, CHP, energy offtake. Then it is visible which element limits the whole.

Planned and unplanned downtime

Separate them in the operator log. Planned downtime is a decision that can be optimised (when, for how long). Unplanned downtime is an event analysed for its causes, for example using the 5 Why method described in a separate guide. Mixing the two categories makes good servicing (more inspections, fewer failures) look bad in the statistics.

Interpretation traps

  1. Downtime caused by the grid. A lack of energy offtake or restrictions on the part of the grid operator is an external event. It should have a separate cause code and not enter the MTBF of the equipment.
  2. Lack of substrate. The engine is stopped because feedstock ran out; this is a logistics problem, not a reliability one.
  3. Small sample. With three failures a year, MTBF has an enormous spread. It is safer to look at a period of 2-3 years or at the total number of hours.
  4. Different definitions of the start of a failure. Decide whether it is counted from the alarm or from the report to the service provider; the difference can amount to hours.
  5. MTTR dominated by waiting for a part. If most of the repair time is logistics, the solution is not a faster mechanic but a stock of parts.

How to use the results

The most useful thing is a ranking of equipment by total downtime, not MTBF alone. A device with frequent, short failures may cause a smaller loss than one rare but long one. Compare indicators over time for the same plant; comparisons with other people's biogas plants are reliable only with identical definitions.

Availability and energy production

High availability does not guarantee high production. A plant may be able to operate for 98% of the time and still produce less, because the biological process is loaded below its capacity or the engine runs at limited power. That is why, alongside availability, it is worth tracking the capacity utilisation factor, that is, the ratio of the energy produced to that possible at nominal power. Only the two indicators together show whether the losses result from equipment failures or from limitations of the process or substrate. This split decides where to look for improvement: in servicing or in feedstock management.

The full set of biogas plant indicators is described in the text on biogas plant KPIs, and the source of data on downtime is the operator log.

What to remember

  • A = MTBF/(MTBF+MTTR), and always state which downtime was included.
  • CHP running hours are not plant availability.
  • Separate external causes (grid, substrate) from technical ones.
  • Make the summary annually and look at the trend, not a single year.

Sources

  1. FNR - Fachagentur Nachwachsende Rohstoffe (Niemcy)
  2. DBFZ - Deutsches Biomasseforschungszentrum