Spare parts and criticality analysis for biogas plant equipment: what to keep in stock

A spare parts stock is a compromise between tied-up capital and the cost of downtime. We show a simple criticality analysis, A/B/C classes and a list of candidates.

Published 4 min readFeedstockData Editorial Team

Other language versions: Polski, Deutsch, Español, Français, Italiano, Nederlands.

Kontener agregatu CHP w zielonej obudowie, na dachu tłumik, chłodnice i komin spalin.
Photo Draco2008 from UK / Wikimedia Commons, licence CC BY 2.0, source file; changes: cropping

Spare parts at a biogas plant are insurance against long downtime that comes at a cost, so the stock should result from a criticality analysis, not from a hunch. The plant runs around the clock, and delivery of some components takes weeks. On the other hand, a shelf full of rarely used parts freezes capital, and some of them age before they are ever needed. This guide shows a simple way of choosing the stock. The parts of the gas engine itself are covered by a separate text on CHP servicing, and here we only refer to it.

Step 1: list of equipment and its impact on production

Start with a list of process equipment: pumps, agitators, feeders, frequency converters, controllers, valves, sensors, gas lines, the cooling system. For each item, answer the question of what will happen to production when it stops. There are three typical answers: the plant stops completely, production drops partially, or the device has a reserve (for example two pumps, one of which is running).

Step 2: criticality rating

A simple method is based on three ratings on a scale of 1-5:

  1. Impact on production (W): 5 means the shutdown of the whole plant, 1 means no impact.
  2. Probability of failure (P): results from history, age and operating conditions, for example components abraded by the slurry have a higher P.
  3. Lead time (D): 5 means several weeks or more, 1 means available immediately from a local supplier.

The criticality score is W × P × D, in the range 1-125. Set thresholds, for example above 60 is class A, 20-60 class B, below 20 class C. The thresholds should be convenient for your plant, not universal.

Step 3: stock classes

  • Class A: parts always kept on site. These are components whose absence stops the plant and whose delivery is long.
  • Class B: minimum stock or an agreement with a supplier guaranteeing a response time.
  • Class C: ordered when the need arises, without stock.

Typical candidates for stock

The list below is an example and needs verification for a specific plant:

Group Example Notes
Seals mechanical seals of pumps and agitators cheap, easily worn, high impact
Bearings bearings of agitator and pump shafts long lead time for special sizes
Sensors pressure and temperature transmitters, level probe quick replacement shortens downtime
Frequency converters converters for agitator and pump drives sensitive to overheating and moisture
Impellers impellers and wear parts of positive displacement pumps abrasive wear grows with the share of sand
Valves shut-off and check valves usually available, but unusual diameters take longer

Cost of stock versus cost of downtime

Compare two calculations on an annual basis. The cost of holding stock is the value of the parts multiplied by the cost of capital and storage, often assumed at over a dozen percent of the value per year. The cost of lacking a part is the probability of failure times the waiting time for delivery times the daily loss of revenue. An illustrative, hypothetical example: if a part costs a few thousand zlotys and its absence would mean over a dozen days of downtime, holding the stock pays off even with a small probability of failure in a year. We develop the method of calculating the loss from downtime in the text on the cost of downtime.

Service agreements and organisation

Not everything has to be held yourself. A service agreement with a guaranteed response time and access to replacement parts (a supplier's pool) is sometimes cheaper than your own stock. Check in it whether the part is delivered by an agreed date and how penalties for delay are calculated.

Take care of order: catalogue number markings, purchase date, storage location, minimum level for ordering. Rubber and electronic components age, so the stock requires a periodic inspection.

Illustrative example

A hypothetical example: the pump feeding feedstock to the digester has W = 5 (without it, dosing stops), P = 3 (work in slurry with an admixture of sand) and D = 4 (unusual size, delivery of several weeks). The criticality is 5 × 3 × 4 = 60, which is the boundary of class A. The seal kit and impeller of this pump therefore go into stock. A simple temperature transmitter has W = 3, P = 2 and D = 1, a score of 6, so class C: it is bought when needed. Such a calculation, repeated for several dozen items, takes one working day, and it allows you to avoid both empty shelves and a store full of random parts. It is worth agreeing the rating values with the service provider, because they know the typical failures of a given device best.

What to remember

  • Choose the stock according to the product of impact, probability and lead time.
  • Class A means parts whose absence stops the plant.
  • Compare the cost of stock with the expected cost of downtime.
  • Update the list after every failure and replacement of equipment.