Annual operational review of a biogas plant: how to sum up the year and plan the next

Once a year it is worth gathering failures, balance, process trends and expenses into one report. We give a review template and a list of actions, including for winter.

Published 5 min readFeedstockData Editorial Team

Other language versions: Polski, Deutsch, Español, Français, Italiano, Nederlands.

Z lotu ptaka: trzy zielone zbiorniki fermentacyjne obok gospodarstwa i placu kiszonkowego.
Photo Martina Nolte / Wikimedia Commons, licence CC BY-SA 3.0 de, source file; changes: cropping

The annual operational review is one of the cheapest tools for improving a biogas plant: it combines data that arise during the year anyway into a picture that allows the next one to be planned. Without it, failures are remembered patchily, and decisions on repairs and stocks are made under pressure. Below we propose a report template that can be prepared by the operator or manager. The texts on individual elements (availability, cost of downtime, spare parts, cause analysis) are a reference point for the subsequent sections.

1. Failures and downtime

A summary of all downtime from the log: date, duration, equipment, cause, code (planned, technical failure, grid, lack of substrate). On this basis calculate:

  • the number of failures and the total downtime per device,
  • MTBF, MTTR and availability, according to the methodology in the separate text,
  • recurring causes, that is failures of the same type.

A ranking of equipment by total downtime shows where the biggest losses are. For the largest events, carry out or supplement a root cause analysis.

2. Mass and energy balance of the year

Compile the mass of feedstock by substrate, the production of biogas and energy, own consumption, the amount of digestate and any losses. Compare with the assumptions from a year ago. Differences may mean a change in substrate quality, leaks, measurement errors or changes in the process. A detailed example of calculating the balance is described in a separate text; here the point is synthesis.

Monthly charts: organic loading, temperature, VFA or FOS/TAC, gas composition, gas production per tonne of organic dry matter. Look for seasonality, slow drifts and periods of upset. Mark what caused them: a substrate change, hot weather, a shutdown, a sensor failure.

4. Servicing and repair costs

Compile expenses on servicing, parts, external services and own labour. Divide them into planned and unplanned. Calculate the servicing cost per unit of energy or per running hour and compare year on year; the methodology of annual costs is covered by the text on OPEX. Add to this the estimated losses from downtime according to the model from the text on the cost of downtime.

5. Plan for the next year

On the basis of the data, prepare:

  1. Repair plan: what, when, who, expected cost. Take into account the running hours of equipment until the next inspections.
  2. Spare parts plan: an update of the A/B/C classes after the year's failures.
  3. Training and staffing plan: competence gaps revealed by failures.
  4. Measurement improvement plan: sensors that drifted or failed, and additional measuring points.
  5. Review of IT security: backups, accounts, remote access.

6. Preparing for winter

November is the last convenient time for work before the frosts. Check the insulation of pipelines and fittings, digester heating and circuits, the operation of condensate traps and gas line heaters, the stock of substrate and oil, unloading and access in difficult conditions, and the stock of class A parts. The details are covered by the text on winter operation.

7. List of corrective actions

End the review with a table: action, cause, responsible person, deadline, verification criterion. At the next review return to this list and check what has been done. A lack of implementation of actions is more important information than a year of good results.

Report template

  • One-page summary: key indicators and the three most important conclusions.
  • Sections 1–4 with data and a short commentary.
  • Plan for the next year and list of actions.
  • Appendices: summary of downtime, charts, list of changes to the plant.

Who prepares the report and when

The report is best prepared by a person who knows the plant day to day, but it is reviewed by a team including the owner, the service provider and the person responsible for the substrate. The summary meeting should last several hours and end with decisions, not just discussion. It is good if the report is always produced in the same period, because then data from successive years are comparable. Collect data on an ongoing basis, in the operator log and in a downtime spreadsheet, so as not to reconstruct the year from memory.

Practical notes

Do not try to create a perfect report straight away. The first review can be short and based on the available data, and in subsequent years it can be expanded with new indicators. More important than the scope is that the report is produced regularly and that its conclusions actually change the plans for repairs, stocks and training for the following year.

The indicators for the summary are described in the text on biogas plant KPIs, the cost structure in the text on operating costs (OPEX), and an example of a balance in the text on the mass and energy balance. The records for the review come from the operator log. Digester heating is covered by the text on heat exchangers and heating failures.

What to remember

  • Once a year gather failures, balance, trends and costs in one report.
  • Assess data over time, not once.
  • Translate the conclusions into a plan of repairs, stocks and training.
  • Track the implementation of corrective actions until the next review.