After a failure it is easy to stop at replacing a part, but if we do not establish why the component failed, the same failure will return. Root cause analysis (RCA) is an orderly way of getting from a symptom to a cause that can be removed. Below we describe a simple process for an agricultural biogas plant. The general plan for responding to incidents is covered by the text on the emergency plan, and here we focus on drawing conclusions after the fact. We do not describe specific events from other plants.
Step 1: secure the facts
Before anyone cleans up and replaces the part, collect:
- records from the SCADA system: alarms, trends of pressure, temperature, drive current, flows,
- operator log entries from previous days,
- photographs of the damaged component and the site,
- the service and replacement history of this device,
- accounts of those present (written down, not from memory after a week).
Keep the damaged part if possible. Inspection of wear often says more than a description.
Step 2: timeline
Arrange the events chronologically, with times: the first deviation of a parameter, the alarm, the operator's reaction, the failure, the repair, the restart. The timeline often reveals that the deviation began earlier than the alarm, which points to a weakness in the alarm thresholds.
Step 3: the 5 Why method
You start with a description of the problem and ask "why?" until you reach a cause that you can influence. Five is usually a sufficient number of questions, not a rigid requirement.
A hypothetical example, serving only to illustrate the method; it does not describe a real event.
- Why did the agitator stop? Because the thermal relay switched it off.
- Why did the relay trip? Because the motor current was elevated.
- Why was the current elevated? Because the impeller met greater resistance: fibres had accumulated.
- Why did the fibres accumulate? Because the feedstock contained more long fibre than usual, and shredding before the digester was weaker.
- Why was shredding weaker? Because the knives were not replaced according to schedule, and the inspection had no clear owner.
The direct cause is the tripping of the protection, the main cause is the blocking of the impeller by fibres, and the systemic cause is the lack of responsibility for the knife inspection schedule.
Step 4: Ishikawa diagram
The fishbone diagram organises possible causes into categories. For a biogas plant the following work well:
- People: training, shift staffing, communication,
- Machines: technical condition, wear, design,
- Materials: quality and composition of the substrate, spare parts,
- Methods: procedures, instructions, schedules,
- Measurements: calibration, sensors, alarm thresholds,
- Environment: temperature, humidity, season.
List hypotheses in each category, and then verify them with facts from steps 1 and 2. The diagram protects against accepting the first explanation that comes to mind.
Types of causes
- Direct: what physically caused the failure.
- Main: the factor without which the failure would not have occurred.
- Systemic: the lack of a procedure, control or resources that allowed the main cause to arise.
Corrective actions usually address the last two levels. Replacing a part deals only with the first.
Step 5: actions and verification
For each cause, define the action, the responsible person, the deadline and the way of checking effectiveness, for example an indicator or a check in three months. Enter the conclusions in the log and take them into account in the annual review. The analysis should not look for someone to blame; its aim is to improve the system of work, and the team reports problems faster when it does not fear punishment.
Typical errors in analysis
The most common errors are stopping at the first answer, looking for someone to blame instead of a cause, and a lack of verification of hypotheses with facts. Another error is formulating causes as the lack of a solution, for example "there was no sensor", because this imposes a ready answer instead of checking why the hazard was not visible. It is also worth making sure that every stage of the chain of questions can be supported by evidence: a record, a photograph or a measurement. If an answer is only a supposition, mark it as a hypothesis to be checked and plan how to confirm it. A short analysis done conscientiously is worth more than a long report based on guesses.
Practical notes
It is worth carrying out the analysis within a few days of the event, while the facts are still fresh and the team remembers the details. Invite people from different areas to the discussion: the operator, the service technician and the person responsible for the substrate, because each of them sees a different fragment of the chain. Write the conclusions briefly on one page and return to them at the next team meeting, so that the actions do not dissolve in day-to-day matters.
Related materials
The first steps after a gas engine stops, from the alarm message to inspection, are described in the text on CHP unit shutdowns. This guide is general and concerns the whole plant. The incident reporting system that supplies material for analysis is described in the text on near-miss events, and the response plan in the text on the emergency plan.
What to remember
- Facts and a timeline before hypotheses.
- 5 Why reaches the cause, Ishikawa checks that nothing was missed.
- Fix the systemic cause, not only the part.
- Close the case with a check of the effectiveness of the action.