Tanks and membranesGuide

Wind, snow and ice on a membrane roof: loads, pressure in the envelope and winter behaviour

A membrane roof carries snow and wind loads thanks to pressure. We describe the standards, the role of the blower, snow clearing, ice on valves and the procedure for wind.

Published 4 min readFeedstockData Editorial Team

Other language versions: Polski, Deutsch, Español, Français, Italiano, Nederlands.

Inżynier w kasku i odzieży trudnopalnej z przenośnym detektorem gazów przy rurociągach biogazu fermentora.
Illustration: FeedstockData (AI, Google Gemini)

A membrane roof is a pneumatic structure: its shape and load capacity result from pressure. Without pressure there is no stability, so wind, snow and ice should be considered together with the blower system, the valves and the power supply. Below are the standards framework and a practical operating procedure.

Standards framework

Climatic loads on structures are determined according to the Eurocodes:

  • PN-EN 1991-1-3 – snow load; the value depends on the snow zone, altitude above sea level, roof shape and exposure coefficients,
  • PN-EN 1991-1-4 – wind actions; they depend on the wind zone, height, terrain roughness and the shape of the structure.

The zone maps are in the national annexes, so characteristic values should be read for the specific location, not adopted as general figures. The designer of a membrane roof should state the design loads for which the structure and the operating pressures have been checked.

How pressure carries the load

Snow acts on the roof with a downward force, and the pressure in the space between the membranes must balance this force. If the load increases, the system raises the pressure, or the inner membrane is pushed towards the gas, which reduces its volume. Wind causes suction on part of the roof surface and overpressure on another, so the shape deforms; constant pressure limits this movement. The blower usually runs in a holding mode at low flow, and if pressure drops it raises its output.

Snow clearing

Snow on a membrane roof is assessed from ground level or from a ladder; climbing onto the roof is usually inadvisable, and when necessary it requires protection and a procedure. If snow has to be removed, then:

  1. soft tools are used, for example brushes on poles, without metal shovels,
  2. snow is removed evenly from the whole surface, so as not to cause uneven loading,
  3. ice is not broken with sharp objects,
  4. pressure and gas level are observed during the work.

Large drifts or snow lying at the edge can cause the membrane to bend and local stresses.

Ice and valves

Ice is a frequent cause of failures in winter. The problems concern:

  • overpressure and vacuum valves, in which moisture can freeze and block the movement of the flap or the sealing liquid; this requires selecting antifreeze protection in line with the manufacturer's documentation,
  • condensate lines and siphons,
  • air intake openings and the blower filter, which can become blocked with frost or snow,
  • rope and perimeter connections, where ice limits the movement of the membrane.

Inspection of these elements should belong to the winter routine and include an entry in the operating log. The principles of setting and testing valves are described in the article Overpressure and vacuum protection of biogas tanks.

Procedure for a forecast of strong wind or snow

Recommended steps that the operator can write into the instructions:

  1. Check the operation of the blower, its filters and power supply; assess whether the standby system works (a second blower or emergency power).
  2. Check the pressure in the space between the membranes and the alarm settings.
  3. Limit the gas level in the storage if possible (for example by increasing offtake), to reduce loads and the risk of gas escaping in case of damage.
  4. Check the safety valves and the antifreeze protection.
  5. Close the manholes, secure loose elements nearby and restrict people's access near the tank.
  6. After the event has passed, inspect the roof surface, fixings and seams.

Documentation and training of staff

The winter procedure works only if the staff know it. It is worth writing it down on one page, placing it in the control room and rehearsing it with the team once a year, before the season, including those who cover at weekends and on public holidays. The exercise should include reading the pressure, switching to the standby blower and determining whom to notify and in what order. Records from exercises and from real events make it possible to refine alarm settings over time and shorten reaction time.

Emergency power

A power failure during a gale is a scenario with serious consequences, because the blower stops maintaining pressure. That is why in plants exposed to such events, standby power, a low-pressure alarm and an action plan are considered, including handing over responsibility for supervision. The running time of the emergency power should be matched to the time for restoring the grid in the region.

Inspection after an event

After strong wind or heavy precipitation, the following are checked: seams and welds, perimeter fixings, mechanical damage (abrasions, cuts), depressions in the membrane in which water and snow can collect, and the tightness of the valves. Minor damage is repaired after drying with a patch in line with the manufacturer's recommendations, and serious damage requires a specialist. The event and the actions are recorded in the log.

Summary

A membrane roof in winter and in wind depends on pressure, so the key is to keep the blower, the power supply and the valves in working order. Loads are determined according to the Eurocodes for the specific location, and operation relies on a simple, rehearsed procedure and inspection after an event.

Sources

  1. CEN-CENELEC — europejska normalizacja (EN 1991-1-3, EN 1991-1-4)
  2. PKN — Polski Komitet Normalizacyjny
  3. FNR — Themenportal Biogas (Fachagentur Nachwachsende Rohstoffe)